We have specialized in Milnor Tunnel washing systems since 1986. Realizing that tunnel systems were the future, we investigated several bottom and top transfer systems and found the Milnor system had more to offer than any other machine.Each tunnel we set up is given an operating manual specific to that machine.
The copyrighted Quick Guide for Milnor CBW's is recognized as an invaluable maintenance and trouble shooting tool for these installations. When Technical Consulting sets up your Milnor tunnel system, you will have the lowest cost, highest production operating system possible.
In most cases the pay back on my services is two weeks to two months. If you don`t have pay back within two months, you don`t pay the difference – this is my personal GUARANTEE.
We are not limited to Milnor systems, we are available to work on other tunnel systems as well!